Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: A problem that needs to be fixed |
Tags: | cliftonings, cliftoningsfloodalleviationschemelivework, closurenotice, flooddefenceswork, floodworks, ncn65, nonsensical, york |
Date time: | 5.57pm, Friday 18th March, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 18.3.22] Clifton Ings, York. [Note: No streetview at this location.] Sign that went up today on Clifton Ings (NCN65). It warns of closure for flood defence work between 8am Monday, 4 April 2022 and 23.59 Tuesday, 4 October 2022. But what do "junction with Public Right of Way 26/4/10" and "junction Public Right of Way 27.1.10" mean or refer to? A map/photos would be practical. Context: #176152.
Comments reflect the views of the original submitter only.